Frequently Asked Questions About Remodeling Plumbing in the Bay Area
Q: Do you handle the plumbing yourselves, or is it subcontracted?
A: We handle it. Plumbing, electrical, tile and waterproofing are performed by our own licensed crew as part of the remodel, under one contract with one point of contact.
Q: Can you move a sink, shower or toilet to a new location?
A: In most cases, yes. Relocating a fixture means rerouting supply and drain lines, which we plan during the design stage so the new layout works structurally and meets code.
Q: Does a kitchen or bathroom remodel need a plumbing permit?
A: Usually, once lines are moved, added or replaced. We pull the permits and carry the project through final inspection as part of the job, so nothing is left for you to close out.
Q: Will the plumbing work add time to my remodel?
A: Rough-in and fixture setting are built into the project schedule rather than added on top of it. Kitchens typically run 6 to 12 weeks and bathrooms 2 to 4 weeks, depending on scope.
Q: What happens if you find old galvanized or cast iron pipes?
A: It comes up often in older Bay Area homes. Once the walls are open we show you exactly what is there and walk through the options before any additional work goes ahead.
Q: How much does the plumbing portion of a remodel cost?
A: Costs vary depending on scope, materials, and layout. We provide a detailed written estimate after a free in-home consultation — no obligation.